How Lithium Batteries Are Helping Companies Overcome Long Lead Times for New Forklift Orders in 2022

With long lead times on new forklift orders, lithium technology can help dealers to make rental and retrofit business models more profitable.

From COVID to “Lead Time” Pandemic!

As the world recovers from the turbulent years of 2020 and 2021, we are seeing all sorts of repercussions across different sectors of the economy. As the Vaccines acceptance became more widespread and the COVID deaths began to decrease around the globe the world started to wake up and demand for items skyrocketed. In the Lift Truck Industry 2021 started stronger than anyone planned – and it didn’t let up. Some thought it was a catch up Blip – orders simply making up for the drop a year earlier – but we have more than eclipsed that drop now. All Time Record order intake in the first and second quarter of the year by virtually ALL forklift manufacturers put intense strain on the Supply Chain and some parts manufacturers simply could not meet the growing demand.


Lack of inventory and record long lead times in the MHI

Lead times started to move out in the 2nd quarter – and they moved out even more in the 3rd quarter – and then pricing started to rise. Multiple factors across the global economy such as low production in the factories, shortage in inventory, increased freight and part costs resulted in price increases that were announced from virtually every Fork Lift Manufacturer. Logistic / freight surcharges were also introduced as a response for the first time in over a decade to help cover the increasing global supply chains cost. Container pricing tripled or quadrupled in some routes.

According to the Industrial Truck Association’s data, the MHE order backlog is bigger than ever in 2022. Lead times have grown from the normal (pre-pandemic) 20–30 weeks to 20, and in some extreme cases up to 30, months. Long waiting lists have been reported by potential customers of Toyota, Crown, Raymond, and HYG. Some OEM dealers stopped taking orders in early 2021!

New Lift truck lead times before the pandemic averaged 10-16 weeks – while I write this in Apr 2022 those same trucks are now 32-45 weeks before delivery and some are over a year. Virtually ALL Lift truck manufacturers are in the same lead time range – no one appears to have been spared. And this is not limited to just Lift truck Manufacturers – Aerial Lift Companies such as Skyjack, Genie and JLG are also feeling the pain of a broken supply chain with lead times uncertain and in some cases over a Year!

The supply side – radical growth in Europe predicted

Political sentiment is the main driver of the lithium-ion battery market in China and Europe. In both regions, the battery market reflects the government's energy strategy. China's domestic oil reserves are small, so it must be imported in large quantities. Thus, the desire for energy security explains much of the motivation for developing battery technology. As far as Europe is concerned, the EU has enacted legislation to bind the group to ambitious emissions reductions. Again, this is a strong driver of battery investment. Reuters reported that higher oil prices - another byproduct of the conflict in Ukraine - could offset rising electric forklift battery costs. The analysis predicts that the average price of electric forklift batteries in 2022 will be 40% higher than in 2021, mainly due to rising prices of nickel, lithium, and other materials. Industry demand for lithium iron phosphate (LFP) batteries.

Lithium batteries can help energize sales for forklift dealers

Industry experts do not expect “stability” in the supply chain any time soon. Pre-pandemic lead times are not coming back before 2024. In the meantime, many companies are running for longer hours and putting more stress on their forklift batteries, especially in the logistics and 3PL industry. Lead-acid batteries in many applications will not last until the end of the lease term, creating a very real risk that operation disruptions and downtime will spiral out of control. Customers are deterred by difficulties in procuring maintenance, and replacements may take years to arrive.

The following are the solutions that forklift dealers can offer to their customers in 2022–2023 by adopting BSLBATT lithium batteries:
Retrofit

At the end of the lease (or with the visible decline of uptime and increasing maintenance labor costs), lead-acid batteries can be swapped to lithium to keep up operations. This step will improve performance, not just sustain it. When the new trucks finally arrive, the same lithium batteries can be used to power the new equipment.

Rent

The lack of new forklifts to replace equipment reaching the end of its life can be mitigated with the rental model. Advanced lithium batteries with modern data capabilities and triple the lifetime of lead-acid batteries provide dealers with an opportunity to develop an attractive and profitable price model.

A better battery is just the start

Today forklift dealers have a chance to help their clients with a very practical solution, while at the same time improving their position in the fast-growing lithium segment of industrial batteries. Practical knowledge and experience with the new lithium technology will continue to drive sales for the years to come. Its IoT connectivity introduces a wealth of possibilities for equipment uptime, operator safety, fleet optimization, and energy savings. Power guaranteed is possible in material handling. Meet the gold standard in MHE battery for hard-working Class I, II, and III forklifts.

For more information on our lithium-ion battery insights, please contact us at inquiry@bsl-battery.com

https://www.lithiumforkliftbattery.com/forklift-batteries.html

The Latest

More Stories

​OPEX® Sure Sort® X with Xtract™ Warehouse Automation System Is Named a Finalist in the New Equipment Digest NED Innovation Awards

MOORESTOWN, NJ (December 18, 2024) OPEX® Corporation, a global leader in Next Generation Automation providing solutions for document, mail, and warehouse automation, has been selected as a finalist in the 2024 NED (New Equipment Digest) Innovation Awards, which celebrates innovations in industrial technology, tools, and equipment that empower businesses to work faster, better, and more cost-effectively.

OPEX Sure Sort® X with Xtract™, a high-speed automated sortation and order retrieval system, was recognized in the NED Innovation Awards Automation category.

Keep ReadingShow less

Featured

photo of self driving forklift
Lift Trucks, Personnel & Burden Carriers

Cyngn gains $33 million for its self-driving forklifts

AML launches StrikerX mobile computer

AML launches StrikerX mobile computer

Richland Hills, Texas, September 12, 2024. AML, a U.S-based manufacturer of barcode data collection products, announces the launch of its latest Android® product, the StrikerX mobile computer.

StrikerX is the evolution of its predecessor, the Striker, but comes equipped with the most powerful processing architecture available for devices in its class, the Qualcomm® QCS6490 processor running Android 13 at 2.7 GHz. Building on the success of the Striker, the new StrikerX maintains the same lightweight and compact form factor but makes a quantum leap in processing power.

Keep ReadingShow less
Hamilton Caster Appoints Andrew D. Stamp as Director of Sales

Hamilton Caster Appoints Andrew D. Stamp as Director of Sales

Hamilton Caster & Mfg. Co., a 117-year-old industry leader in heavy-duty industrial casters, proudly announces the enhancement of its legacy Super Endurance Caster (SEC) series, now rebranded as the Spinfinity® Super Endurance Caster (ZFSEC) series. In addition, Hamilton is introducing the all-new Spinfinity® Super Endurance Dual Caster (ZFSEC2) series, both of which feature a new heavy-duty 'V-Style' seal designed to elevate performance in the most demanding environments.
The Spinfinity® Super Endurance Caster (ZFSEC) series replaces Hamilton’s legacy SEC series, setting a new benchmark for kingpinless caster design in extra heavy-duty applications. Central to this upgrade is the heavy-duty 'V-Style' seal, which offers protection against dirt, debris, and moisture. This advanced sealing technology ensures consistent performance and extends the life of the caster, making it the ideal choice for environments where reliability is critical.
"With the introduction of the V-Style seal, the ZFSEC series is engineered to withstand the harshest conditions while providing zero-fix, 100% maintenance-free operation," said Mark Lippert, president of Hamilton Caster. "This enhancement allows our customers to minimize maintenance costs and downtime, further solidifying Hamilton’s reputation for durability and dependability."
The ZFSEC series retains the robust construction that Hamilton is known for, including a swivel top plate and inner raceway made from forged steel, providing superior strength for shock conditions. Sealed precision ball bearings are also now standard in all wheels, contributing to the maintenance-free performance of the series. Notably, the zerk fittings have been eliminated, as the new design makes them unnecessary.
Complementing the ZFSEC series, Hamilton introduces the all-new Spinfinity® Super Endurance Dual Wheel Caster (ZFSEC2) series. This dual wheel series is engineered for extra heavy-duty applications where stability, durability, and maintenance-free operation are paramount. Like its counterpart, the ZFSEC2 series leverages the new 'V-Style' seal, ensuring that each caster is fully protected against contaminants that could compromise performance.
Combined with sealed precision ball wheel bearings, this caster series ensures zero-fix, 100% maintenance-free performance. The dual-wheel configuration enhances stability and allows for a lower overall height, offering a perfect blend of strength and maneuverability.
Casters in both series are finished in a durable HAA polyester platinum powder coat and are available in a wide variety of wheel types, allowing for customization based on application needs. For complete wheel specs and product details check out the Spinfinity® Super Endurance Caster Landing Page and all-new Spinfinity® Super Endurance Dual Caster Landing Page.

https://www.hamiltoncaster.com/Top-Menu/Resources/New-Products/hamilton-enhances-spinfinity-casters-launches-new-dual-wheel-caster-series

New Horizon Releases Innovative Functionality for Optimizing Inbound Logistics Scheduling at DCs

ACTON, Massachusetts – September 3, 2024 – New Horizon Soft, LLC (https://www.newhorizon.ai), a global leader in AI-powered supply chain planning software, announced today the release of a new version of its Buyers Workbench procurement planning software. The latest version includes the ability to optimally schedule inbound deliveries, taking into account distribution center (DC) receiving capacity, thus minimizing receiving bottlenecks and lowering inbound logistics costs. A research paper describing the innovative methodology and its deployment at an iconic $10B+ U.S. quick-service restaurant chain was recently published in the peer-reviewed academic journal, the International Journal of Operations Research and Information Systems.

Supply chain organizations typically plan purchase orders without regard to DC receiving capacity. This leads to bottlenecks on some days and underutilized staff on others. New Horizon’s methodology, called Master Purchasing Receipt Scheduling (MPRS), uses a novel algorithm to automatically and optimally schedule deliveries. The algorithm plans deliveries at the time of purchase order creation and results in a steady volume of deliveries and lower planning and logistics costs. While first deployed at a restaurant chain, the methodology is applicable to any manufacturer, wholesaler, retailer, or foodservice company operating high-velocity DCs.

Keep ReadingShow less
Thinkink Packaging Launches New Line of Custom Frozen Food Boxes to Enhance Product Freshness

Thinkink Packaging Launches New Line of Custom Frozen Food Boxes to Enhance Product Freshness

Pennsylvania, United States – August 2024 – Thinkink Packaging, a leader in innovative packaging solutions, is excited to announce the launch of its new line of Custom Frozen Food Boxes. Designed to meet the growing demand for sustainable and durable packaging in the frozen food industry, these new boxes offer a perfect blend of functionality, quality, and eco-friendliness.

The frozen food market is rapidly expanding, with consumers increasingly seeking convenient, ready-to-eat meals that maintain freshness and quality. Thinkink Packaging’s Custom Frozen Food Boxes are specially engineered to meet these needs, offering superior insulation to preserve product integrity from production to the consumer's freezer.

Keep ReadingShow less